If you have not walked or driven by our shul lately, it is definitely worth your while! There has been some pretty dramatic progress.

The exterior finish of the sanctuary has been completed, while adjacent areas are moving forward as well. The sanctuary windows are almost all in, the lobby stair frame and railings have all been installed, and the spray foam insulation has been completed.

Drywall is still being installed, and mechanical ductwork, plumbing, and electrical and data wiring are ongoing. The storm water system installation is also in progress.

In the next two weeks the contractor will form the landscape retaining walls on the north side, install the final sanctuary windows, finish the sanctuary ductwork, and begin framing the sanctuary ceiling. The team will also begin installing the ceiling grid in the lower level, and bathroom tile.