Exterior Steel Framing & Sanctuary Roof Structure

06/02/2021 09:41:02 AM

Jun2

If you’ve walked or driven by the shul lately--and if you haven’t, you definitely should-- you probably noticed some pretty dramatic changes. New heavy gauge exterior steel framing at the new addition and lower level is in progress. The new sanctuary roof structure has been installed; it is just waiting for its roofing finish. Inside, rough plumbing and electrical work continue and interior framing is ongoing. New foundations and footings at the exterior Rutherford entrance are about to begin, which is exciting. The underpinning at the north entrance foundation is already complete.

In the next two weeks, there will be a review of the mockup wall with Exterior Insulated Finishing System, a rigid insulation board covered with a stucco type finish. New roofing will be installed over the lobby, and mechanical rooftop units will be installed. Mechanical, plumbing, and electrical work still continues, as it has all along. And finally, the IT & audio-visual systems will be coordinated.

Thu, July 29 2021 20 Av 5781