A lot has happened since our last update. The structural steel, roof deck and new floor slab at the sanctuary addition have all been installed, as have the Cordova stone veneer and stone base. The new boiler room equipment has been installed and the new generator is on site. In the existing building, joists, steel supports and underpinning continue, and the wall framing and door frame installation are proceeding. Mechanical, plumbing, and electrical work are all ongoing, as they will be for a while. In the next couple of weeks, the kitchen hood and backsplash panel will be installed and the light fixtures for the sanctuary, chapel, and lobby will be chosen and other interior selections will be made.